Texture Removal
Popcorn and knockdown texture scraped off, ceilings skimmed flat and repainted, and the room put back clean.
Texture Removal in Burlington NCFull bathroom rebuilds across Alamance and Guilford County. Demo to trim, one crew, no handing you off between four different trades.
A bathroom remodel in Burlington NC goes wrong in the waterproofing, not the tile. We build the wet area to shed water before anything decorative goes on top of it.
Bathroom remodeling in Burlington, NC. We rebuild bathrooms across Alamance and Guilford County, from demo through tile, vanity, flooring and trim, with the same crew on it start to finish.
The usual bathroom horror story is not bad work. It is a gap. The tile guy finishes and leaves, the vanity is three weeks out, nobody owns the trim, and a room you could not use for a fortnight becomes a room you cannot use for two months.
We run it as one job. Demo, framing repairs, the wet area, tile, fixtures, flooring and trim are all ours, so the schedule is one schedule and there is one person to ask when you want to know where it is.
Every failed bathroom we get called into failed at the water, not the finish. Tile is a wear surface. It is not waterproofing. What keeps water out of your floor joists is the layer behind it, and that layer is invisible the moment the job is done, which is exactly why it is the layer people skimp on.
So the wet area gets built properly. Backer board rather than drywall anywhere it can get wet. Seams and corners treated. The pan sloped to the drain so water actually goes where it is supposed to instead of sitting in a corner for six years quietly rotting the subfloor.
Get that right and the tile lasts as long as you want to look at it. Get it wrong and the prettiest bathroom in Alamance County is a slow leak with a nice finish on it.
Bathrooms in older Piedmont houses hide two things: soft subfloor around the toilet flange, and framing that has taken years of small leaks. Neither is visible until demo day.
Both are cheap to fix while the room is already stripped and expensive to fix once the tile is down. We look before we price where we can, we tell you what we expect to find, and if we open a wall and it is worse than expected you hear about it that day with photos, not at the end on an invoice.
Layout gets set out before anything is stuck down, so the cuts land somewhere sensible and you are not looking at a half-inch sliver of tile at the most visible corner for the rest of the time you own the house.
Vanities get set level and scribed to the wall, because no wall in a house from the seventies is straight. Faucets, shower heads, toilets and disposals we install. Work that needs a licensed plumbing or electrical contractor in North Carolina is outside what we take on, and we say so up front rather than get halfway in and stop.
Floor goes in with the transition to the hall thought about rather than covered with a strip at the end. Baseboard and casing get run tight, caulked and painted, because trim is the thing your eye actually reads as finished or unfinished.
If the ceiling still has texture on it, that is the moment to deal with it. See popcorn ceiling removal in Burlington NC. Doing it while the room is already a work site costs a fraction of doing it as its own visit.
Price depends on the size of the room, whether the layout moves, whether it is a tub or a tile shower, what the tile is, and what we find under the old floor. A refresh that keeps the layout is a very different number to moving a shower.
Time is the question people actually care about. A straightforward rebuild that keeps the layout is usually a couple of weeks. Moving fixtures adds to it. We give you a real schedule with the price, and if you only have one bathroom we plan the sequence around that rather than pretending it does not matter.
See drywall and trim work, custom closets, or everything we do. Call (336) 380-9459 to get it looked at.
A rebuild that keeps the existing layout is usually about two weeks. Moving the shower or the toilet adds time. If it is your only bathroom we sequence the work around that and tell you which days are the bad ones before we start.
We install fixtures: faucets, sinks, toilets, shower heads, disposals, fans and light fixtures. Work that requires a licensed plumbing or electrical contractor in North Carolina is outside what we take on, and we tell you that up front rather than get halfway in.
We cut it out and rebuild it, and you hear about it the day we find it with photos. Soft subfloor around a toilet flange and water-damaged framing are the two most common things hiding under an old bathroom, so we flag the possibility when we price the job.
Often, yes. If the layout works and the wet area is sound, new vanity, flooring, trim and paint transform the room for a fraction of a full rebuild. We will tell you honestly which one your bathroom needs.
No, and that is the single most expensive misunderstanding in bathroom remodeling. Tile is a wear surface. The waterproofing is the layer behind it, and that is the layer we build properly because it is the one that fails.
Popcorn and knockdown texture scraped off, ceilings skimmed flat and repainted, and the room put back clean.
Texture Removal in Burlington NCHoles, cracks, water-stained board and whole rooms. Hung, taped, floated and finished, then trim run tight.
Drywall & Trim in Burlington NCRuined drywall, subfloor and framing cut back to something solid and rebuilt, instead of patched over.
Water & Fire Damage in Burlington NCCall and describe the room. We will come look and tell you what it takes to bring it forward.
(336) 380-9459